[LB049277], Letter from Eb. Williams Thomas to Edison Phonograph Works, May 8th, 1891
https://edisondigital.rutgers.edu/document/LB049277
Transcription
5/8/91 Edison Phonograph Works Edison Phonograph Works Gentlemen The following is a list of lumber and wood required for seven ore separators. 2 pcs 6x16x18 yellow pinned planned 4 sides 1 “ 6x16x12 “ 14 “ 6x8x20 “ 1 “ 6x8x22 “ 1 “ 6x12x16 “ 1 “ 4x12x18 “ 7 “ 2”x2 ½”x10 “ 7 “ 4x12x20 “ 1100 superficial feet of 5/8 oak planned both sides 10” wide any lengths 1100 superficial feet of 1 ¼” oak rough 16 ft long-any widths 7 pieces 7”x7”x8” where wood thoroughly dry Yours truly Edison Laboratory Thomas Advise foreman to see me before cutting this year’s pine timber LB049278 Edison Phono Wks. Laboratory 5/8/91 Gentlemen [?] The following is a list of fittings + material required for the magnet frames of seven ore separators. 49 wrought iron loop straps-see drawing 154 washers 4” dia for ¾” bolt use the 7 brake loops ½” 20” to centre 5 ½” inside dia heavy pattern 42 “ “ “ 18” “ “ “ “ “ 260- ¾ wroughtwasher 2 pcs 1 ¼ pipe 16 1/8” long 260 5/8 “ “ 28 “ “ 17 ½” “ Yours truly 49 “ brass pipe 3/4x21 1/8 Edison Laboratory 49 brass bolts 5/8x28 ½ Thomas 28 “ “ 5/8x5 28 iron bolts 1x28 ½ 28 “ “ 1x27 35 “ “ 3/4x 2’7 1/2 “ 7 “ “ 3/4x2’7 ½” 35 “ “ 3/4x2’6” 31 “ “ 3/4x19 7 “ “ 3/4x14 84 “ “ 3/4x12 7 “ “ 3/4x10 4 “ “ 3/4x8 1 “ “ 5/8x8’ “ 5/8x8 ½ Lag screws 3/8x3 Washer 4” dia for 1” bolts-see pattern Use only the heavy pattern