Mr. Ward M.N.
After carrying out your order to carefully examine heating system in Mill #1, I have to report that the general distribution of boils is bad, particularly on ground floor. This shown by variable and insufficient temperature at and near shafts 3 High Reels and elevators. There are not enough coils on ground floor, and the branches from mains to coil are in many cases, considering the length, too small for exhaust steam.
In several cases the branches are taken from bottom of mains, thereby taking the condensation from mains through radiators. This is particularly bad under High Rees where the only outlet for condensed water is through radiators. The drips from horizontal coils are in several places reduced at headers making traps, and in one case, header pitches wrong way.
At the time temperature on enclosed sheet was taken, building had been closed for over 12 hours. There was no wind every precaution had been taken to insure getting all the heat possible.
Temperature in #1 Mill; Boiler Pressure 72 lbs. Pipes 12 lbs.
Time  Location
A.M.                                                                                     40 deg
5:35 3 H.R. west end                                                            37

                  east end                                                             37

5:45 3 H.R. west end                                                             30

      "         "   east end                                                           31
                       

5:57 Angle shaft                                                                    32

        Passage way; west side

6:07 #18 Con.                                                                       38
6:08 Foot of #6 Elev.                                                            28
6:22 Tail and #25 Con.                                                            37
6:24  West and of counter shaft for 20 Con.                              32
6:33 Intersection of 18 & 25 Con.                                                 34
6:34 19 Conveyor                                                                       28
6:44 #1 & #2 Belt Machine west side                                           36
6:50   "         "          "       east side                                             39
6:56 4" Magnets                                                                         46
East end of drive shaft to 8" Magnets                                       44 7:15 Blower floor line shaft                                     43
7:25 Week end     "       "    Blower floor                  40
7:34 West end 8" Magnets                                       45
7:42 East and counter shaft for #6 Elev.                   48
7:58 Head of 20 1/2 Con.                                          62
8:08 Counter shaft for 7 & 13 1/2 Con. West            52
8:15    "        "        "            "                  East               49
8:25 Head of 4 & 5 Klev.                                             58
8:35 Drive shaft to Blower floor & 15 Con.                   52
8:45 Head of 4 & 5 Con.                                                 53
8:55 3 High Rolls                                                            45
Walter Burns,
Foremen

Export